Sewer Repair Work Planned for next week, November 22nd through 24th
Installation work will continue on Oakland Ave between Revere Ave and Norton Ave. through Wednesday, November 24th.
In addition, there will be sewer lining crews working at various locations.
Monday 11/22
Install a 12” CIPP Liner in Revere Ave. between Longwood Ave. and Oakland Ave., Begin setting up the temporary sewer bypass in Oakland Ave. between Revere Ave. and Mammoth Road.
Tuesday 11/23
Install a 24” CIPP liner in Oakland Ave. between Revere Ave. and Mammoth Road.
Wednesday 11/24
Install a 24-inch CIPP liner in Massabesic St. between Valley St. and Jewett St. EB
Address/Location
Manchester, NH: City
Manchester, NH 03101
Contact
Emergency: 9-1-1