Advisory
Sidewalk Replacement being done on Central Ave. Message 1 of 2
Sidewalk replacement is being done on Central Avenue near the overpass by St Joseph's High School. There will be limited pedestrian access until 8 p.m. this evening. Please avoid the area if walking and plan a different route. Sorry for the inconvenience
Address/Location
Borough of Metuchen
500 Main St
Metuchen, NJ 08840
Contact
Emergency: 9-1-1
Non-emergencies: 732-632-8500