Advisory
Work on the Henry St. Bridge is rescheduled to start on Monday May 7, 2018. Work to be below deck w/ minimum affect on traffic.
The City of Norton Shores wishes to notify you that work on the Henry Street Bridge has been rescheduled to restart on Monday, May 7, 2018 with bridge pier painting and re-encasement of the existing water main through the use of barges. Work will be below the bridge deck and should not directly affect traffic, although the occasion shoulder closure may be required. The work will last between 3-5 weeks (weather dependent).
Address/Location
City of Norton Shores
4814 Henry St
Norton Shores, MI 49441
Contact
Emergency: 9-1-1
Non-emergencies: 231-798-4391