Metro Purple Line Update: 17 full weekend closures begin Sept. 8th for Wilshire/La Cienega station construction.
Metro Purple Line Update: 17 full weekend closures begin Sept. 8th for Wilshire/La Cienega station construction.
Here is what you need to know about the start of the 17-weekend closure for PHASE I (La Cienega/Wilshire Station).
- Full closure for construction will begin at 8 p.m. on Fridays and
continue through Mondays at 6 a.m.
- Work will occur 24/7 during the closures.
- Building access in the construction areas will be maintained but
some sidewalk closures and pedestrian detours are anticipated.
- There will be detours for traffic and Metro buses during the 17 full
weekend closures. For any additional info needed on bus detours
call 323.GOMETRO (323-466-3876).
- The bus detours will follow the street detours — look for signage
about stop locations. There will be stops on the detours very close to
Wilshire.
For local access and detours visit Metro's page:
http://thesource.metro.net/2017/08/31/17-full-weekend-closures-begin-sept-8-for-wilshirela-cienega-street-decking-what-you-need-to-know/?hootPostID=efe21d4a4f09a005b939e37a7ec9efb5
Address/Location
BHPDalert
464 N Rexford Dr
Beverly Hills, CA 90210
Contact
Emergency: 9-1-1
Non-emergencies: 310-550-4951
TEXT-A-TIP - Text TIP BHPDALERT followed by your message, to 888777