Advisory
Sidewalk work along Henry (Seminole-Forest Park) to start Monday (6/27). SB shoulder, temp. lane closures and delays to be expected.
The City of Norton Shores wishes to notify you that the placement of concrete sidewalk along the west side of Henry Street between Seminole Road and Forest Park Road is scheduled to start on Monday, June 27, 2016 and continue until the end of July.
Access and travel along Henry Street will remain open during the work with south bound shoulder closure and the occasional lane closures to be controlled by flagging operations. Delays are to be expected.
Address/Location
City of Norton Shores
4814 Henry St
Norton Shores, MI 49441
Contact
Emergency: 9-1-1
Non-emergencies: 231-798-4391