Please be Advised that Asphalt Overlay of the Hot-in-Place work will start next week (8/24 thru 9/19) at various locations with the City.
The City of Norton Shores wishes to notify you that the placement of the asphalt overlay pavement for the 2015 Hot-in-Place roadway pavement recycling project is scheduled to start as soon as Monday August 24, 2015 and run until September 19, 2015 (weather dependent). The work will involve several streets in various locations throughout the City. Access and travel thru the affect street will be restricted during the work with traffic being controlled by flagging operations and delays are to be expected. The affected streets are as follows:
1) Aue Road, Henry to Cul-de-Sac
2) Winslow Court Loop, West of Henry Street
3) Estes Street, Norton to Arbor
4) Shorewood/Hendrick Loop , west of Lake Harbor
5) Shorewood Drive, Lake Harbor to Elmwood
6) Ellis Road, Harvey to US-31
7) Devin Drive, Grand Haven to Cul-de-Sac
8) Airport Road, Grand Haven to Airline
9) Porter Road, Henry to Lake Harbor
Address/Location
City of Norton Shores
4814 Henry St
Norton Shores, MI 49441
Contact
Emergency: 9-1-1
Non-emergencies: 231-798-4391