Advisory
HMA Overlay work on Norton, between McCracken to Roosevelt, to be completed in late evening. Construction traffic controlled by flagging.
The City of Norton Shores wishes to advise you that the Norton Avenue HMA Overlay Pavement work is scheduled to be completed late this evening (Monday, July 28th) for the roadway between McCracken and Roosevelt.
It would be advisable to avoid travelling in this area during the work.
Construction traffic shall be controlled by flagging. Long delays are expected.
Address/Location
City of Norton Shores
4814 Henry St
Norton Shores, MI 49441
Contact
Emergency: 9-1-1
Non-emergencies: 231-798-4391