U.S. HIGHWAY 101 CENTER MEDIAN PLANTING AND IRRIGATION PROJECT
U.S. HIGHWAY 101 CENTER MEDIAN PLANTING AND IRRIGATION PROJECT
SANTA BARBARA – A project to replant and install new irrigation systems in the center median of U.S. Highway 101 between Garden Street and the Mission Creek Bridge will begin on Monday, July 22.
Motorists will encounter intermittent inside shoulder closures in both directions of Hwy. 101 Monday through Thursday from 6 am to 7 pm. The No. 1 (fast) lane will be closed intermittently in both directions Monday through Thursday during the overnight hours from 9 pm to 6:30 am. This roadwork will not occur in both directions at the same time. Motorists can expect a delay not to exceed ten minutes.
Address/Location
ReadySBC Alerts
, CA
Contact
Emergency: 9-1-1
Non-emergencies: 805-681-5526