Gulf Road Reopened between Burns and Hilliard Roads – East Side Sewer Relief Project
Gulf Road has been reopened and has returned to normal traffic, including 35MPH.
Much of Gulf Road between Vista Court and the wastewater Plant has rough and uneven asphalt installed. It is a temporary fix while there is heavy construction traffic operating between Whitman Boulevard and the wastewater Plant.
Whitman Boulevard is closed at Gulf Road. There is no through traffic permitted.
Watch out for slow-moving heavy construction vehicles that operate on Gulf Road between the Waste Water Plant and Whitman Boulevard.
Address/Location
City of Elyria Ohio
131 Court St
Elyria, OH 44035
Contact
Emergency: 9-1-1
Non-emergencies: 440-326-1400