City Street crack sealing from May 23 to May 31, 2017
The contractor will be concentrating efforts in the southern part of the city south of Hartman Park and the City Airport main runway. The contractor will let residents know when to avoid parking on the streets in front of their homes. Crack sealing cannot take place in rainy conditions so residents are cautioned to be flexible when anticipating the contractor’s presence.
The contractor will be contacting residents and hanging notifications on doors as the construction operations approach their neighborhoods. It will be most helpful if residents can avoid parking in the streets during these operations so the entire street can be maintained while the contractor is in the area. It will also be helpful if residents can avoid over-watering and car washing during these times so the streets do not get wet.
Address/Location
City of Aztec, NM
201 W Chaco St
Aztec, NM 87410
Contact
Emergency: 9-1-1
William Watson
City of Aztec
[email protected]
505-334-7660