Receive alerts from your local agencies
...or text your ZIP CODE to 888777 for mobile alerts

Full Notification

California Highway Patrol - Southern Division
Monday August 18th, 2014 :: 04:57 p.m. PDT

Advisory

Santa Clarita closures for I-5 Truck Lanes Project beginning tonight, August 18 through Friday August 22nd.

FOR IMMEDIATE RELEASE


Closures for I-5 Truck Lanes Project

Santa Clarita — The California Department of Transportation (Caltrans) plans to implement the closures listed below during the week of August 18-22, 2014, as part of a project that is constructing truck lanes on I-5 between Pico Canyon Road/Lyons Avenue and the Antelope Valley Freeway (SR-14). More information about the project is here.

Ramp closures will be nonconsecutive. Detours will be signed. No unusual levels of dust, noise or vibration are expected. Closures are subject to change.

Closure information for this and other freeway projects is available on the Caltrans website.

For real-time traffic information, visit quickmap.dot.ca.gov, go511.com, or call 5-1-1.

NORTHBOUND I-5

Lanes

Up to three lanes of northbound I-5 between the end of the existing truck lane and Lyons Avenue: 9 p.m. to 5 a.m.

Note: At least one lane will be open at all times. The most restrictive closures (i.e., the most lanes closed) will occur between 1 a.m. and 4 a.m.

Truck route collector: 10 p.m. to 5 a.m.

Ramp

Calgrove Blvd. on-ramp: 9 p.m. to 6 a.m.

SOUTHBOUND I-5

Lanes

Up to three lanes of southbound I-5 between Lyons Ave. and the end of the existing truck lane: 9 p.m. to 6 a.m.

Note: At least one lane will be open at all times. The most restrictive closures (i.e., the most lanes closed) will occur between 1 a.m. and 4 a.m.

Ramp

Calgrove Blvd. on-ramp: 9 p.m. to 6 a.m.

About the Project

This project is widening the freeway and bridges to add a truck lane to the outside of I-5 in both directions by paving the median area and outside shoulder, and shifting the mixed-flow lanes inward. Three median retaining walls and two short sections of outside retaining walls will be built to accommodate this widening. The southbound truck lane will extend from Pico Canyon Road/Lyons Avenue to SR-14 (3.7 miles), while the northbound lane will run from SR-14 to Gavin Canyon (1.4 miles).

The new truck lanes will ease traffic delays, improve goods movement, absorb traffic growth due to population increase (both residential and commercial), and enhance safety by separating truck traffic from passenger vehicles.

Construction began in May 2012 and will be completed in late 2014. Funds administered by Metro. For more information, visit I-5info.com.

For the safety of the construction crew and motorists, please be attentive to closures, slow for the cone zone, and move over one lane where possible.

Address/Location
California Highway Patrol - Southern Division
411 N Central Ave
Glendale, CA 91203

Contact
Emergency: 9-1-1
Non-emergencies: 818-240-8200

Navigate & Discover