Receive alerts from your local agencies
...or text your ZIP CODE to 888777 for mobile alerts

Full Notification

City of Temple City Public Safety
Friday April 11th, 2014 :: 05:25 p.m. PDT

Advisory

Weekly Rosemead Blvd Construction Advisory

NOTE: New items are asterisked.

REPORTING PERIOD:
Week of April 14, 2014

CONSTRUCTION AREA:
Rosemead Boulevard within Temple City limits—i.e., from Union Pacific Railroad (UPRR) underpass on the south to Callita Street on the north.

*CONSTRUCTION HOURS:
Monday-Friday, 7 a.m. – 3:30 p.m.

NOTE: There is no construction on rainy days. To keep with the latest project updates, visit www.rosemeadblvd.com. Work may occasionally occur on weekends, and/or during holidays.

*PLANNED ACTIVITIES:
With the project now nearing construction, a punch list is being developed to ensure that all components are completed per the project design—sidewalk and roadway paving, traffic lane striping, landscaping, lighting, etc. In coming weeks, crews will be adding artistic elements, etching camellia designs into the sidewalks along the corridor, painting the UPRR bridge, and beginning installation of public art mosaic floor pavers. Other remaining activities include installation of directional wayfinding signage and directories.

ANTICIPATED IMPACTS:
Bicycle & Pedestrian Access: Bike lanes are now available. Cyclists must ride in the direction of traffic. Users are advised that Rosemead Boulevard remains a construction zone with intermittent activities. Please proceed cautiously. Sidewalks may occasionally be restricted/closed for work. Pedestrians and cyclists are cautioned not to enter barricaded work areas. Obey all worksite signage. Onsite crews are instructed to provide as-needed assistance to pedestrians passing construction areas.

Parking: Parking is available only within marked spaces along Rosemead Boulevard north of Las Tunas Drive. Do not obstruct the bike lane. Parking spots are located next to the bike lanes, in the space between the landscaped medians. Only marked spaces may be used. Those needing permits for overnight parking between 2-5 a.m. should call the Public Safety and Services Division at (626) 285-2171, ext. 2332.

Trash Pick-Up: Do not set trashcans in the bike lanes. Residents should place bins beyond the bike lane—either against the curb of the bicycle median, or in striped-off areas. For multifamily complexes, please keep oversized garbage containers within your property for pickup by Athens Services.

Lane Closure: Rosemead Boulevard is now reopened to two traffic lanes in each direction. Remaining work may on occasion require brief, localized lane closures.

Report Debris: To report displaced traffic control devices or disorderly construction conditions for cleanup, call the hotline at (626) 476-7376.

TIPS & REMINDERS:
When traveling through the construction area, drivers, cyclists and pedestrians are asked to be patient, proceed with caution, obey flaggers, posted signage and the law at all times.

A 30 mph speed limit is in effect on Rosemead Boulevard between UPRR and Callita. Sheriffs are actively enforcing the construction area for speeding and unsafe driving. Per state law, fines for moving violations are doubled within construction zones.

For your safety and that of workers, do not enter or travel in the blockaded construction lane at any time.

Exercise caution and watch for uneven ground in the construction zone.

For project-related questions, comments or concerns, speak directly with a City representative by calling the designated hotline at (626) 476-7376. Onsite crews are not responsible for addressing public inquiries, as such may hinder work progress.

STAY CONNECTED:
Nixle: For advisories sent directly to your phone, text ROSEMEAD to 888777. Standard text messaging rates apply.

Project Website: To learn about the project, or subscribe to weekly updates, logon to www.rosemeadblvd.com.

Project Hotline: To directly speak with a project representative, call the project hotline at (626) 476-7376 or email [email protected] for response within 24 hours.

City Manager’s Report: Read updates and view photos of Rosemead Boulevard construction progress in the City Manager’s Report, published the first and third Fridays of the month.

MEDIA CONTACT:
City of Temple City Communications Office, (626) 285-2171, ext. 2324

Address/Location
City of Temple City Public Safety
9701 Las Tunas Dr
Temple City, CA 91780

Contact
Emergency: 9-1-1
Non-emergencies: 626-285-2171

Rosemead Boulevard Project Hotline
[email protected]
626-476-7376

Navigate & Discover