Receive alerts from your local agencies Sign Up ...or text your ZIP CODE to 888777 for mobile alerts not sure how?

Full Notification

Metropolitan Police Department, City of St. Louis
Wednesday March 16th, 2011 :: 12:16 p.m. CDT
Advisory

Just a reminder that the Grand Bridge will be closed for construction, starting Monday, March 14th.

Just a reminder that the Grand Bridge will be closed for construction, starting Monday, March 14th.

The planned bridge renovations and improvements to the Grand Metrolink Station will take between 18 and 24 months to complete.

Grand will be closed between Chouteau and Highway 40 for approximately 14 months. The on and off ramps to Highway 40 from Grand will remain open throughout the construction project.


The new Grand Bridge and Grand MetroLink Station will include:

Two through lanes in each direction
Bus pullouts (to keep traffic moving)
Shared use shoulders with bike lanes
13-foot wide pedestrian walkways
Four 57-foot towers, decorative concrete and railings
9-foot-wide raised, irrigated landscaped median maintained by St. Louis University
New elevator and stairs towers for MetroLink platform access
New Scott Transit Plaza with decorative lighting, pedestrian waiting area
58-car park-ride lot
For more information about the Grand MetroLink Station or information regarding any changes to services offered by Metro during construction, please visit http://www.metrostlouis.org/.

Address/Location
Metropolitan Police Department, City of St. Louis
1200 Clark Ave
St. Louis, MO 63103

Contact
Emergency: 9-1-1
Non-emergencies: 314-231-1212

District 9
314-444-2569

Navigate & Discover